Loading
Page views this IP this session = 1 of 10 unsubscribed pagesPentland Firth
Subscribers see an interactive map with Pentland Firth and local projects displayed.
( Subscribe for £100 )to have full access to all Wave projects and details.
Subscribe to Wave for exact generator location including nearby generators
Subscribe for £500 to include full csv and KML downloads of all Wave project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Pentland Firth (Wave , Agreed/Planning) Location in the UK : Scotland, Pentland Firth, North Scotland Type of installation: Wave on/offshore: off Turbines :4 Capacity : 6 MW Approx Date of 1st power generation:
/YES
ScottishPower Renewable Energy Limited (hereafter referred to as “ScottishPower Renewables”) is proposing to develop a Demonstration Tidal Array (hereafter referred to as the ‘Tidal Array’) in the Pentland Firth. The proposed Tidal Array would have a capacity in the range of 10-20MW of renewable power for export to the grid and would contribute to meeting the Scottish Government’s targets of providing 50% of Scotland’s electricity generation from renewable sources by 2020.
The Tidal Array would consist of up to 20 submerged demonstration tidal streamgenerating devices. The candidate demonstration tidal device will be based on an existing 300kw prototype device that is currently undergoing a period of research, development and testing. It is envisaged that the existing prototype will be developed to provide a larger scale demonstration device, in terms of potential output (1-1.5MW).
The Pentland Firth fills and drains the North Sea twice a day - water flows of up to 3 million tons a second.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Inner Sound Phase 1A (MeyGen) 6 MW
|
Energy Type: |
Tidal Stream |
County: |
Orkney Islands Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
2436 / B0899
District:
|
Applicant: |
Atlantis Resources
Application :
|
(Go to search to find Application) |
Site Address: |
Pentland Firth and Orkney waters strategic area, between Caithness on the Scottish mainland and the island of Stroma
|
|
KW1 4YL
|
County: |
Orkney Islands Region: Offshore
|
OS Coordinates: |
335503 / 335503
|
Development Status: |
Operational
|
Application Submitted: |
7/19/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
1/21/2015
|
|
|
Generator Live |
2/20/2017
|
This Record Last Updated: |
11/6/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Inner Sound Phase 1B (Phase 2) (MeyGen) 28 MW
|
Energy Type: |
Tidal Stream |
County: |
Orkney Islands Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
4980 /
District:
|
Applicant: |
Atlantis Resources
Application :
|
(Go to search to find Application) |
Site Address: |
Pentland Firth and Orkney waters strategic area, between Caithness on the Scottish mainland and the island of Stroma
|
|
KW1 4YL
|
County: |
Orkney Islands Region: Offshore
|
OS Coordinates: |
335503 / 335503
|
Development Status: |
Planning Permission Granted
|
Application Submitted: |
7/19/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
11/15/2023
|
RO Banding (ROC/MWh) |
2
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|